LIST OF WORKS COMPLETED & ON-GONING BY THE FIRM
Sl. No. Project Name
Client
Contract Value
(TK)
Completion
1.
Improvement of Dhulauri GC- Kalinagar GC via Islampur UP Office & Sundarpur UP Office Road Ch. 7215m-13015 m UZR, Part-2, ID No. 170662004, Upazila :Sadar, District : Chapai Nawabgonj.
Executive Engineer, Local Government Engineering Division, LGED, Chapai Nawabgonj
  6,33,91,080.00     On-going
2.
Rehabilitation of Embankment in CEP polder no. 35/3: (A) Re-sectioning of Embankment 10.000km. 29.400 during the FY 2011-12 and 2012-13 ( Invitation for tender no 08/2011-2012 ) Tender Package No: BWDB: FDR/ Bagerhat/W-3A) Upazila- Bagerhat Sadar and Rampal district : Bagerhat.
Executive Engineer, BWDB, Bagerhat.
3,99,00000.00 On-going
3.
Improvement of Dhulauri GC- Kalinagar GC via Islampur UP Office & Sundarpur UP Office Road Ch. 00m-13015 m UZR, Part-2, ID No. 170662004, Upazila :Sadar, District : Chapai Nawabgonj
Executive Engineer, Local Government Engineering Division LGED, Chapai Nawabgonj
    5,73,43,056.00     On-going
4.
Bank River protection & Road Work at serajgonj Through Chaina Harbour Engineering Company.
Executive Engineer, O&M Division, BWDB, Sirajgonj.
  10,37,000.00   On-Progress
5.  
Construction of 306.40m Long Prestressed Girder Bridge on Khalek Seriti Shangha (R&H) – Joynagar GC Road at Ch.9060m under Janjira Upazila, District: Shariatpur,
Executive Engineer, Local Government Engineering Division LGED, Shariatpur
  23,88,99342.00   On-Progress
6.
Land development and earth filling, Package No. W1
Engr. Md Hafijur Rahman Director (Planning & Development) Jatia Kabi Kazi Nazrul Islam University
1,56,84,240.00 2011-2012
7.
Bank Revetment Work along the left Bank of Teesta River from K. 50.30 to Km. 50.55 at Kalmati in C/.W Protection of Teesta River Left Bank from Teesta Barrage to Chandimari ( 1 st Phase) Project in UZ. Lalmonirhat Sadar, Dist. Lalmonirhat Under Lalmonirhat O & M Division, BWDB,Lalmonirhat during the year 2099-10.
Md. Enayet Ullah Executive Engineer Lalmonirhat O & M Division, BWDB, Lalmonirhat.
2,26,97,971.00 2011- 2012
8.
Repair of damaged river bank protection work from meterage(-) 8980.00 to meterage (-) 9160 to comnection with “Protection of chapai Nawabganj Sadar and Shibganj Upazila from the erosion of the Padma River ( 1 st Revised)” project under Nawabganj O& M vision, BWDB, Chapai Nawabganj during the FY 2011-2012  
Md. Mukhlesur Rahman Executive Engineer Nawabganj O & M Division BWDB, Chapai Nawabganj
96,35,079.96 2011-2012
9.
Bank revetment work along the left bank of the Padma River at Bakher Ali from Meterage (+) 7362.00 Meterage (+) 7562.00 in connection with “Protection of Chapai Nawabganj Sadar and Shibganj Upazila from the erosion of the Padma River ( 1 st Revised)”Project under Nawabganj O& M Division, BWDB, Chapai Nawabganj) during FY 2010-2011
Md. Mukhlesur Rahman Executive Engineer Nawabganj O&M Division BWDB, Chapai Nawabganj
2,65,05,038.35 2011-2012
10.
Repair of damaged protective work on the left bank of the Padma River at Bakher Ali from M. (+) 7562.00 to M. (+) 7762.00 in connection with “Protection of Chapai Nawabganj Sadar and shibganj upazila from te erosion of the Padma River” Project under Non-Development Revenue Budget ( Financial Code 5974) of Nawabganj O & M Division, BWDB, Chapai Nawabganj during the FY 2012-13 & FY 2013-14 (Tender No. 06/2012-2013, pakage No. RPW, Lot No. P-1)
Sub-Divisional Engineer Nawabganj O&M Sub-Division BWDB, Chapai Nawabganj
3,90,03,283.2 2011-2012
11.
Works Construction of a New Railway Bridge of span 3 X60 ' -0 ' Supplying of Steel Girder and making diversion between Badarganj-Shampur station of Rangpur-Parbatipur section of Bangladesh Railway
Divisional Engineer Bangladesh Railway Lalmonirhat
4,57,44,321.00 2011-2012
12.
Construction of Bank Revetment work on the right bank of jamuna River at Ranigramin Upazilla- sirajgonj Sadar, District-Sirajgonj during FY2007-2008 & 2008-2009 ( 166300m to 166820=520m)
Executive Engineer, BRE (Specilized) O & M Division, BWDB, Sirajgonj
  14,13,50000.00     2010-2011
13.
Construction of Walkway with bank protection and passenger Waiting shed under the project Construction of port facilites in order to prevent unauthorized encroachment of the buriganga river and its foreshore land.
Executive Engineer, Dhaka division BIWTA, Dhaka & Project Director.
  7,05,40000.00   2010-2011
14
Repair of damaged bank protection work of Bangali river left bank at Dighalkandi from Km. 0.615 to Km. 0.950 (length 335metre) in Upazilla – Sariakandi, Dist: Bogra
Executive Engineer, BRE(Specilized) O&M Division, BWDB, Sirajgonj.
1,39,69,897.06 2009-2010
15
Repair of damaged bank protection work of Brahmaputra river right bank at Titparal from Km. 1.600 to Km. 1.895 (length 295metre) in Upazilla – Sariakandi, Dist: Bogra
Executive Engineer, BRE(Specilized) O&M Division, BWDB, Sirajgonj.
2,34,12,006.46 2009-2010
16
Repair of Titprol Revetment in connection with merger of Bangali & Jamuna River at Titporol & Debdanga in Upazilla Sariakandi, Dist. Bogra from Meterage (-)= 707.00m.
Executive Engineer, Bogra O&M Division, BWDB, Bogra.
3,99,74,687.00 2009-2010
17
Construction of Bank Revetment work on the right bank of Jamuna River at Ranigram in Upazilla-Sirajganj Sadar, Dist. Sirajganj
Executive Engineer, BRE(Specilized) O&M Division, BWDB, Sirajgonj.
14,13,50,821.84 2009-2010
18
“Construction of a Walkway with Bank Protection and Passenger Waiting Shed” Under the project “Construction of port facilities in order to prevent unauthorized encroachment of the Buriganga river and its foreshore land”.
Executive Engineer BIWTA, Dhaka Division, Dhaka .
7,05,40,275.61 2009-2010
19
Construction of flexible road from algi bazar to Rayer bazar .
Executive Engineer LGED Chandpur,
95,01,650.00 2009-2010
20
Manufacture and Supply of CC block and Hard Rock for building stock pile at Kalitola Groyne and Sirajganj Hard Point in connection with “Flood damage Rehabilitation -2007 works” under Water Management improvement Project (WMIP) in Upazilla – Sariakandi and Sirajganj Sadar Under Bogra & Sirajganj.
Executive Engineer, BRE(Specialized) O&M Division, BWDB, Sirajgonj
6,16,25,225.00 2009-2010
21
Contract Package No: EDDRP/ADB/RJZ/SRG/R-01: Nalka-Sirajgonj Road from Km. 0.000 to Km. 10.000, invited under Rajshahi Zone vide invitation reference No. EDDRP/RJZ-01/2007-2008 dated 09-03-2008
Additional Chief Engineer, RHD , Rajshahi Zone.
3,03,05,908.00 2008-2009
22
River Bank Protection work by CC Blocks and Sand filled Geo-Bags, along the river Meghna from Km. 68.000 to Km. 68.500 = 0.500 in Polder No. 56/57 at Lalmohan Upazila Under Bhola O&M Division-II, BWDB, Bhola
Executive Engineer, Bhola O&M Division-II, BWDB, Bhola.
4,37,30,397.00 2008-2009
23
Land Development at Purbachal New Town Project, Sector No. 01, Sector No. 03, Sector No.05 & Sector No. 07 Package No. 49, Group No. M under Rajuk
Project Manager – 2 Purbachal New Town Project, RAJUK, Dhaka .
16,17,49,926.00 2008-2009
24
Repair of damaged bank protection work of bangali river left bank at Dighalkandi from Km. 0.615 to km. 0.950 (length 335 meter) ) in Upazila – Sariakandi, Dist. Bogra
Executive Engineer, BRE(Specilized) O&M Division, BWDB, Sirajgonj.
1,12,15,015.00 2008-2009
25
The work of loading earth/sand (Group No-11) in the law land of Posi Mouza of Purbachal Natun Shahor Prokolpo.
Project Manager – 2 Purbachl New Town Project, RAJUK, Dhaka .
2,06,00,204.00 2008-2009
26
Construction of Naogaon Polytechnic Institute electrical works & Supply of equipments etc.
Executive Engineer, Education Engineering Department, Naogaon Zone, Naogaon.
21,62,700.00 2008-2009
27
Repair of damaged bank protection work of Barahmaputra river right bank at Titparal from Km. 1.600 to Km. 1.895(lenth 295 meter) in Upazila – Sariakandi, Dist. Bogra
Executive Engineer, BRE(Specilized) O&M Division, BWDB, Sirajgonj.
2,33,81,264.00 2007-2008
28
Re-Construction of Boundary wall in/c. Repair & Renovation work of Rajshahi polytechnic Institute, Thana- Boalia, Dist. Rajshahi
Executive Engineer, Education Engineering Department, Rajshahi Zone, Rajshahi.
12,26,559.00 2007-2008
29
Construction of single Storied Academic Building with 3- storied foundation including Sanitary, Electrification. Sinking of Shallow Tubewell & Supplying of Furniture works at Ranihati High School , Upazila-Shibgonj, Dist-Chapi Nawabgonj
Executive Engineer, Education Engineering Department, Rajshahi Zone, Rajshahi.
23,20,053.00 2007-2008
30
Package No. W5 Reconstruction/Construction of Bridge No. 42 (Up & Down line) excluding making temporary arrangement between Biman Bandar & Tongi station of Bangladesh Railway as per approve plan during the year 2003-2004.
Executive Engineer/ Dual Gauge Project , Bangladesh Railway, Dhaka .
14,04,58,700.00 2006-2007
31
Protection work of the re-built of Bridge No.42 Up & Dn line both approach in between DABB-TGI under Executive Engineer / Dual Gauge Project, Bangladesh Railway, Dhaka . During the year 2006-2007.  
Executive Engineer / Dual Gauge Project , Bangladesh Railway, Dhaka
2,29,30,400.00 2006-2007
32
Flood Damage Rehabilitation Component under Shariakandi, Dhunot, Kahaloo & Sonatala Upazila,District- Bogra Contact Package No.Bog/FDR(UZR)-2 under Executive Engineer, Local Government Engineering Department, Bogra, during the year 2006-2007.
Executive Engineer, Local Government Engineering Department, Bogra.
1,97,80,745.00 2006-2007
33
Improvement of Kathalia UP Office-Rangpur Bazar via Fajurkandi Bazar Road (Ch. 0+000-4+500km, Cont. Package No.Nar/UR-69) under Sadar Upazila, Dist. Narsingdi under RTIP vide work order memo No.LGED/Nipra-Nar/RDP-26-60/04-05/5311.Under Executive Engineer, Local Government Engineering Department, Narsingdi, during the year 2006-2007.
Executive Engineer, Local Government Engineering Department, Narsingdi.
1,43,74,715.00 2006-2007
34
Supply / execution of blance work of Bridge No. 47 between Tongi and dhirashram station of Tongi-Joydevpur section of Bangladesh Railway as per approve plan. Under Division Engineer-2, Bangladesh Railway, Dhaka . During the year 2005-2006
Division Engineer-2, Bangladesh Railway, Dhaka
3,26,67,000.00 2005-2006
35
Construction of station building, extension of platform, extension of platform shed, new car parking, fencing, extension of road with other related ancillary works in connection with Remodeling and reconstruction of Srimongal, Kulaura & Brahmonbaria stations against work order No. 785-KA/Srimongal station Re-modeling/D-2. Under Division Engineer-2, Bangladesh Railway, Dhaka . During the year 2004-2005.
Division Engineer-2, Bangladesh Railway, Dhaka
3,09,47,337.00 2004-2005.
36
Installation of Transformer, Under Ground Electrical Cable Line, Transmission line at Mymensingh 18 Town Power Distribution Project under BPDB, Mymensingh. During the year 2001-2002.
Bangladesh , Power Development, Mymensingh. (BPDB)
1,27,00,000.00 2001-2002.  
37
Supply & Installation of 12 Nos. 1000 KVA Digital Electrical Sub-station equipments under the General Manager/Project Director, Installation & Expansion of Digital Telephone Exchange in various District Head quarter of Bangladesh T&T Board, under Bangladesh T&T Board. During the year 2000-2001.
Bangladesh T&T Board
2,11,42,000.00 2000-2001
38
Laying of Under Ground Telephone Cable Net Work for Tkakurgaon Exchange (3000 Digital) line. Under Bangladesh T&T Board. During the year 2000-2001.
Bangladesh T&T Board
1,59,64,494.00 2000-2001
39
Laying of Under Ground Telephone Cable Net Work for Noagoan Exchange (2000 Digital) line. Under Bangladesh T&T Board. During the year 2000-2001.
Bangladesh T&T Board
1,06,42,99.00 2000-2001
40
Construction of Thana Health Complex at Kazipur, Sirajgonj including Hospital building, Staff quarter, Nurse Dormitory, Pump house, Deep tube well, Internal Road , Electric & Sanitary works etc. Under Ministry of Health & Family Welfare. During the year 2000-2001.
Ministry of Health & Family Welfare
9,64,55,000.00 2000-2001.
41
Construction of Spur No.2 at Maizbari (BRE KM139.700) under the project "Protection of Meghai Bazar, shovgacha and Simla area from the erosion of the Jamuna River in Sirajgonj District. Under Executive Engineer, Sirajgonj O&M Division, BWDB, Sirajgonj. During the year 2000-2001
Executive Engineer, Sirajgonj O&M Division, BWDB, Sirajgonj.
10,45,86,000.00 2000-2001
42
Construction of Hydraulic Structures & Bridge/Culverts over Secondary & Tertiary Canals of Dinajpur (Branch) canal under Teesta Barrage Project under Saidpur W,D. Division-II, BWDB, Saidpur Nilphamari during the year 1999-2000.
Saidpur W.D. Division-II BWDB, Saidpur, Nilphamari
8,66,45,000.00 1999-2000.  
43
Collectorate (DC Office) Building at Sirajgonj District including Sanitary, Water line Construction & Electrification work. Under Public Work Department, Sirajgonj. During the year 1999-2000.
Public Work Department, Sirajgonj.
1,14,38,930.00 1999-2000.
44
Construction of 187.46 meter 6(six) spans RCC Bridge over permanent foundation at 3rd K.M. of NalamSimulia Road under Executive Engineer, RHD, Road Division, Manikgonj during the year 1999-2000.
Executive Engineer, RHD , Road Division, Manikgonj. .
5,88,55,000.00 1999-2000.
45
Construction of six storied pucca building including 3-unit sanitary latrine & sinking of a tube well for multipurpose use to the selected Government Schools & Colleges. Under Facilities Department, Ministry of Education during the year 1999-2000.
Facilities Department, Ministry of Education.
5,64,00,000.00 1999-2000
46
River Bank Protection Project (Contract B1 & B2) under BWDB supply Installations of Transformer, Generator & Power distribution line for temporary facilities at Sirajgonj. Under HYUNDAI JAN DE NUL JV. During the year 1998-1999.
HYUNDAI JAN DE NUL JV.
2,77,00,000.00 1998-1999
47
Construction of office building, inspection shed for Vehicle inspection Centre, Internal Road , Sub-station, Installation of PABX system, supply and fitting fixing window type air condition with all ancillary works (Group No.03) at Rajshahi. Under Bangladesh Road Transport Authority, during the year 1998-1999.  
Bangladesh Road Transport Authority
5,62,43,057.25 1998-1999.  
48
Construction of Auliakhana Syphon at 19.14km over Teesta Main Canal under Nilphamari District. Under W.D. Division BWDB, Nilphamari, during the year 1998-1999.  
Nilphamari District. Under W.D. Division BWDB, Nilphamari.
5,81,09,540.29 1998-1999.  
49
Construction of 93.73 metre 3(three) spans Baily Bridge (P.S.B.) over permanent foundation at 3rd km of Nolam-Simulia Road under RHD, Manikgonj Road Division during the year 1998-1999.
Nolam-Simulia Road under RHD , Manikgonj Road Division
4,88,12,441.90 1998-1999.  
50
Construction of Road Overlay Project of Road & Highways Department ( RHD ) Contract Nos.5 & 6. Under ITCL & CHIC Dhaka, during the year 1998-1999.  
ITCL & CHIC Dhaka
5,73,20,000.00 1998-1999.  
51
River Bank Protection Project (Contract B2 site) under BWDB work for Bank revetment and laying and supply of Stone Chips, Shingles, etc. of Geotextile at Sirajgonj. Under HYUNDAI JAN DE NUL JV. During the year 1998-1999.
HYUNDAI JAN DE NUL JV.
5,25,00,000.00 1998-1999.  
52
River Bank Protection Work at upstream of Sailabari Groyne under Brahmaputra Flood Embankment (BRE) in P.S. & District Sirajgonj, under Executive Engineer, Sirajgonj O&M Division, BWDB, Sirajgonj. During the year 1998-1999.
Executive Engineer, Sirajgonj O&M Division, BWDB, Sirajgonj.
3,61,48,693.00 1998-1999.  
53
1998 Flood Damage Restoration Work (Non Project Roads) Contract No. Thakurgaon-1 under 1998 flood Damage Restoration Works & Addl. Chief Engineer, RHD , Rangpur Zone, Rangpur. During the year 1997-1998.
Roads & Highways Department
5,35,23,141.00 1998-1999.  
54
Earth Work at Baskhali, Contract No.5(Five) in connection with “Re-habilitation & Reconstruction of Embankment Cum Road Project “Part “C”in polder No.64/1A under O&M Division-II BWDB, Chittagong . During the year 1997-1998.    
Islam Trading Consortium Ltd. (ITCL) & China Heilongjiang International Economic & Technical Co-operative Corporation ( CHIC )  
9,53,10,000.00 1997-1998
55
Earth work at Chokoria Contract No.6 (six) in connection with “Rehabilitation & Reconstruction of Coastal Embankment Cum Road Project Part “C” in polder No.64/2B under O&M Division Cox's Bazar, BWDB, During the year 1997-1998.
DO
6,61,50,000.00 1997-1998
56
Construction of Diversion Nos.4,5&6 structure Nos. 60,61&62 of Contract No.2 Jamuna Bridge Access Road Project under RHD vide work order No.SJC/SC/98 dated 17.5.98 under Project Manager, Sungjee Construction Co.Ltd., Korea, During the year 1997-1998.
Project Manager, Sungjee Construction Co.Ltd. , Korea .
54,96,039.00 1997-1998
57
Executed the work of “Repair and maintenance of sub-base, Base, Bituminous carpeting of Borovita to Dalia Road from ch.15.50 Km to ch.25.50 Km Group No.2 under Nilphamari W.D. Division, BWDB, Nilphamari. During the year 1997-98.
Nilphamari W.D. Division, BWDB, Nilphamari.
2,87,39,500.00 1997-1998
58
(1) Construction of flexible pavement with seal coat at 8 th (p), 8 th & 10 th K.M. of Hobigonj-Baniachong-Azmirigonj Road under the Executive Engineer Engineer, RHD, Road Division, Hobigonj. during the year 1997-98.  
Road & Highways Department
53,88,672.00 1997-1998
59
(2) Reconstruction & repair of flexible pavement, path hole betuminous carpeting with seal coat at 4 th & 5 th K.M. of Jagadispur Shahjibazar-Sayestagonj Road under the Executive Engineer Engineer, RHD, Road Division, Hobigonj. during the year 1997-98 .
DO
19,34,358.00 1997-1998
60
(1) Construction of pavement at 4 (p) & 5 (p) K.M. of Sirajgonj, Raigonj Road under the Executive Engineer, RHD, Road Division, Sirajgonj. During the year 1996-97.
DO
31,46,784.00 1996-1997
61
(2) Construction of Earth work, HBB & protective work at 1 st K.M. of Ratonkandi Bhutghacha Road under the Executive Engineer, RHD, Road Division, Sirajgonj during the year 1996-97.
DO
22,78,426.00 1996-1997
62
Construction of Hydraulic Structure in Naluar Haor Project under W.D. Division, BWDB, Sunamgonj during the year 1994-95.  
W.D. Division, BWDB, Sunamgonj.
64,75,000.00 1994-1995
63
Construction of 2-vent RCC Drainage Regulator Cum-Bridge at Sovipara, Rajshahi. Under W.D. Division, BWDB, Rajshahi during the year 1993-94.  
W.D. Division, BWDB, Sunamgonj.
67,19,000.00 1993-1994
64
Construction of Flood Embankment /Cum Road along the bank of Turag River from Tongi Railway Bridge to Mirpur Jaforabad Ferry Ghat from 13.50km to 14.50km. Under Dhaka O&M Division-II BWDB, Dhaka during the year 1993-94.
Dhaka O&M Division-II BWDB, Dhaka .
3,14,77,624.51 1993-1994
65
Construction of 70-00 RCC Bridge at Nailsapara on Sirajgonj Kazipur Road under Road Division, Sirajgonj during the year 1991-92.    
Road Division, Sirajgonj.
32,14,580.00 1991-1992
66
Canal Re-excavation & Construction of Embankment along both Banks in Isamoti Project under BWDB, Pabna during the year 1990-91.  
BWDB, Pabna
46,25,00.00 1990-1991.
67
Hydraulic Structure under Dhumkhali Project. Under W.D. Division, Moulavibazar during the year 1989-90.
W.D. Division, Moulavibazar
38,73,615.00 1989-1990.
68
Construction of 4 Vent RCC Regulator at Gharialdanga Kurigram under BWDB Division, Kurigram during the year .
BWDB Division, Kurigram
31,17,200.00 1987-1988
69
Construction & Armouring of T-head of Sailabari Gross Dam-Cum Groyne & Bank Protection work with C.C. Block Manufacturing, Dumping & Placing of Sand Filled Gunney Bags, C.C. Block, Brick Crates, Porcupines, Brick Matressing, Construction of Permeable spur. Under W.D. Division, BWDB, Sirajgonj during the year 1985-86.
W.D. Division, BWDB, Sirajgonj
1,37,05,620.00 1985-1986
70
Construction of Collectorate Building in connection with the Construction of Dist. Head Quarter at Sirajgonj under Bangladesh Power Development Board, Sirajgonj during the year 1985-86.
Power Development Board, Sirajgonj
3,50,00,000.00 1985-1986
71
Construction of Longuchara 4-vent RCC Regulator at Matherkapon District Moulavibazar under W.D. Division, BWDB, Moulavibazar during the year 1982-83.
W.D. Division, BWDB, Moulavibazar
32,25,000.00 1982-1983